Q-2, r. 17.1 - Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact

Full text
347. Work in connection with works to collect runoff water or direct groundwater, if carried out less than 30 m from an open peat bog, requires authorization pursuant to subparagraph 10 of the first paragraph of section 22 of the Act, except if carried out in the bioclimatic domains of balsam fir stands with paper birch and black spruce stands with moss.
O.C. 871-2020, s. 347; O.C. 985-2023, s. 20.
347. Work in connection with works to collect runoff water or direct groundwater, if carried out less than 30 m from an open peat bog, requires authorization pursuant to subparagraph 10 of the first paragraph of section 22 of the Act, except if carried out in the bioclimatic domains of balsam fir stands with white birch and black spruce stands with moss.
O.C. 871-2020, s. 347.
In force: 2020-12-31
347. Work in connection with works to collect runoff water or direct groundwater, if carried out less than 30 m from an open peat bog, requires authorization pursuant to subparagraph 10 of the first paragraph of section 22 of the Act, except if carried out in the bioclimatic domains of balsam fir stands with white birch and black spruce stands with moss.
O.C. 871-2020, s. 347.